青青草在久久免费久久免费-男人的天堂免费a级毛片无码-中国免费看的片-亚洲熟妇无码av另类vr影视

News Center

Location: Home >News Center

News Center

Recommend

Contact Us

Jiangsu Xinhantong Intelligent Electrical Technology Co., Ltd

Tel: 0511-80303080

Fax: 0511-80303081

Address: No.1 Chaoyang North Road, Chengbei Science and Technology Industrial Park, Sanmao Street, Yangzhong City

Bridge construction matters

2023-10-09
766次

1、 Construction

Measurement and positioning → Support and hanger manufacturing device → Bridge device → Grounding treatment

2、 Construction methods and skill methods

(1) Measurement and positioning: Use the line snapping method to mark the equipment position of the bridge, determine the fixed position of the bracket, and mark it correctly. Composite cable tray is the second generation product in the cable tray series and a new type of cable tray. It is suitable for laying various projects, units, and cables. It has the characteristics of simple structure, flexible configuration, convenient installation, and novel form. The positioning of the bridge in the vertical shaft should first use the suspension line method to determine the device reference line. If the reserved hole is not suitable, it should be adjusted and repaired in real time.

(2) Bracket manufacturing device

(3) According to the construction drawing design elevation and bridge specifications, locate and manufacture the bracket based on the measured dimensions. These brackets are produced in the factory. All components of the cable tray need to be galvanized and installed on the outdoor tray outside the building. The full name of a rigid structural system, including straight sections, elbows, tees, groove types, tray or stepped cross sections, as well as support arms, hangers, etc., which have tightly connected support cables. Slot type cable tray, also known as slot type cable tray, is a fully enclosed cable tray suitable for laying computer cables, communication cables, thermocouple cables, and other control cables for high sensitivity systems. It has good effects on shielding control cables from interference and protecting cables in highly corrosive environments. There is no ceiling beam bottom lifting or wall support device, but there is a ceiling internal lifting or wall support device. In public places without suspended ceiling, connect structural members, and take into account the beauty and convenience of construction and maintenance, use wall or column support devices or install them on the bottom chord members of Truss roof. The bracket of the wall mounted device is fixed with expansion bolts, and the spacing between the brackets does not exceed 2 meters. Supports and hangers should be added at the intersection of straight and non straight sections, at the deformation joints of buildings, and in the middle of non straight sections with a bending radius greater than 300mm. The support and hanger device should ensure that the degree or verticality of the bridge meets the requirements.

(4) Bridging device

① Regarding the extraordinary appearance of the bridge, the dimensions measured on-site will be handed over to the means supplier, who will manufacture based on the dimensions and reduce on-site processing. The material, model, thickness, and accessories of the bridge meet the design requirements.

② Before installing the bridge, it is necessary to coordinate with various specialties to prevent conflicts between large diameter fire pipes, sprinkler pipes, hot and cold water pipes, drainage pipes, as well as air conditioning and exhaust equipment.

③ Lift the bridge to the predetermined position and secure it to the bracket with bolts. Carefully check the dimensions at the turn. The slope of this bridge should be the same as the slope of the building. For bridges on curved building walls, the curved shape should be consistent with the building. The bridge is connected to the bridge through a connecting plate, and the connecting bolt is a half round head bolt, which is located on the inner side of the bridge. The cracks between cable trays must meet the design requirements to ensure that the cable trays of the system are integrated.

④ Bridges crossing deformation joints in buildings should be treated as expansion joints in accordance with the enterprise standard "Special Steel Cable Tray Installation Technology". When the straight section of the steel bridge exceeds 30m, a thermal expansion compensation device should be installed.

⑤ The bridge device is horizontal and vertical, with a uniform and beautiful appearance


contact us

Jiangsu Xinhantong Intelligent Electrical Technology Co., Ltd

Tel: 0511-80303080

Fax: 0511-80303081

Address: No.1 Chaoyang North Road, Chengbei Science and Technology Industrial Park, Sanmao Street, Yangzhong City

色窝窝m3u8| 久久综合婷婷国产二区高清| 亚洲线精品一区二区三区| 亚洲无码流畅在线| 强行内射大学生| 国产一二三四不卡| 日韩在线不卡免费视频一区| 日本熟妇色一本在线观看| 日韩无码中文字| 毛片久久久久久久| 欧美老妇激情一区| 亚洲精品乱码久久久久久动图| 黑人巨大精品欧美一区二区奶水 | 人妻1234| 亚洲国产欧美一区二区三区波多野结衣 | 亚洲一区二区三区精彩视频小说| www.九九热| 在厨房被c到高潮| 一区二区三区无码高清视频| 国产 浪潮av性色四虎| 99精品无码一区二区| 亚洲av无码在线一区二区三区| XXXX69中国| 久久久亚洲欧洲日产国产成人无码 | 精品伊人久久久大香线蕉的特点| 国产jiZZHD精品巨大粗暴长| 网站h在线观看| 五月婷六月丁香狠狠躁狠狠爱| 韩国无码久久| 亚洲无码手机在线不卡| 黑人大战孕妇14p| 久激情内射婷内射蜜桃欧美一级| 一区二区三区蜜桃| 五月天操逼网站| 黑人久久久久| 超碰人人操人人乐精品一区| 成人免费区一区二区三区| 日本在线小电影| cao的好爽高清无码| 精品久久久久久久久久久久| 奇米四色影视|